Panels generate
Solar panels generate electricity when sunlight is available.
Store suitable solar generation for use later with a battery solution shaped around your system, electricity use and backup priorities. Kveto Sunspire helps make capacity, compatibility and next steps clearer.
A battery can store suitable excess electricity from a rooftop solar system. The property may then use that stored energy when solar generation is lower or electricity requirements are higher.
Solar panels generate electricity when sunlight is available.
Available generation can first supply eligible home or business loads.
Suitable excess generation can charge a compatible battery system.
The battery may discharge later according to its settings and available charge.
Battery storage can support different objectives. The appropriate design depends on the result you value, the energy available to charge the battery and the loads it may need to supply.
Shift suitable solar generation into evening or overnight usage periods.
Stored solar may reduce some electricity imported from the grid.
A battery may capture generation that cannot be exported, subject to design.
Compatible equipment can be designed around defined circuits and power needs.
Discuss future EV charging, electric appliances and changing usage patterns.
Review an eligible Virtual Power Plant program separately before joining.
Important: a battery may not be financially beneficial for every property. Suitability depends on available solar, usage timing, tariffs, system cost, operating settings and the outcome you want.
The right pathway depends on what is already installed, product compatibility, the installation site, electrical requirements and whether backup is part of the objective.
For properties with an operating rooftop solar system.
For a coordinated new solar-and-storage design.
For owners with clearly defined outage requirements.
Battery comparisons can be confusing because capacity and power are often discussed together. Both matter, but they answer different questions.
Backup duration depends on usable capacity, starting charge, the supported loads, battery power limits and whether solar can recharge the system during the outage.
Often it may be possible, but the practical pathway depends on the current system and property. The assessment should identify compatibility before a product is recommended.
AC-coupled systems generally use a separate battery inverter. This is a common pathway when adding storage to existing solar.
DC-coupled systems may use a compatible hybrid inverter to manage solar and battery energy.
The better arrangement depends on the existing equipment, new-system design, efficiency considerations, backup requirements and product compatibility.
Standard grid-connected solar normally shuts down during a power outage for safety. A battery can support backup only when the system includes compatible equipment and is configured for that purpose.
Discuss the exact appliances or circuits that matter. Whole-property expectations, large loads, motor starting power and three-phase arrangements can materially change the design.
Define your backup needsAustralia's program can reduce the upfront cost of an eligible small-scale battery installation through small-scale technology certificates. Eligibility depends on the current rules, product, installer, system and installation.
Official guidance current in July 2026 supports eligible residential and non-residential installations with battery systems from 5 kWh to 100 kWh nominal capacity. STCs apply to the first 50 kWh of usable capacity, and the level of support tapers for larger capacities.
Program settings and certificate factors can change. The proposal should identify the eligibility and discount assumptions used at the time it is prepared.
Check my battery pathwayThere is no responsible universal price or payback figure. A useful estimate needs product, property, usage and tariff assumptions that can be reviewed.
A proposal should make capabilities, assumptions, inclusions and responsibilities easy to compare.
Ask a proposal questionClarify savings, self-consumption, backup or other priorities.
Review existing or planned solar, usage and available information.
Discuss capacity, power, integration and backup assumptions.
Confirm location, switchboard, electrical and access requirements.
Confirm current product, installer and program requirements.
Complete the agreed installation and system configuration.
Receive operating, monitoring, backup and support information.
Review settings when tariffs or energy priorities change.
Bring a recent bill, existing solar details and your main battery goal. We will help identify the next information needed.
General answers to support your research. A property-specific recommendation requires system, usage and site information.
Ask another questionA solar battery stores electrical energy for later use. With a compatible solar system, suitable excess generation can charge the battery before the stored energy is discharged according to the system settings and property demand.
It depends on excess solar generation, evening and overnight use, tariffs, exports, battery cost, degradation, applicable support and non-financial goals such as backup. A battery may not pay for itself within its lifetime in every situation.
Price varies with usable capacity, power output, inverter arrangement, brand, backup scope, installation complexity, electrical work and applicable discount. Obtain a proposal that clearly states all inclusions and assumptions.
Sizing should consider evening use, excess solar, existing solar capacity, tariff, essential backup loads, phase arrangement and future electricity needs. Bigger is not automatically better.
kWh describes energy capacity - how much energy can be stored. kW describes power - how much can be delivered at one time. Both affect what a battery can do.
Often it may be possible, but compatibility depends on the current inverter, solar capacity, switchboard, installation location, phase arrangement, monitoring and the proposed battery pathway.
Only when compatible equipment is installed and configured for backup. Not every battery installation provides backup, and some systems support only selected circuits or phases.
There is no single duration. Runtime depends on usable capacity, starting charge, battery power limits and the appliances operating. For example, heavier loads consume stored energy much faster than lighting and communications.
Lifetime may be described through years, charge cycles, energy throughput and remaining capacity. Product conditions, operating temperature, usage and warranty terms all matter.
Usable capacity is the portion of stored energy available within the battery's permitted operating range. It may be lower than the nominal capacity shown in the product name.
Eligible installations may receive certificate-based support when current product, installer, solar connection, capacity, documentation and other program requirements are met. Eligibility must be confirmed for the specific installation.
The current program supports eligible residential and non-residential premises, including businesses, subject to all requirements. The benefit should not be assumed until eligibility is checked.
Potentially, if the battery, retailer, location and program are compatible. Review control permissions, payments, event rules, battery operation, contract terms and exit conditions before joining.
Compare usable capacity, continuous and peak power, coupling, backup scope, installation inclusions, monitoring, warranties, expected savings assumptions, discount eligibility and who provides ongoing support.
Tell Kveto Sunspire about your property, existing or planned solar, electricity use and backup priorities. We will help turn those details into a clearer next step.
General information only. Battery suitability, compatibility, backup capability, runtime, savings, payback, program eligibility and cost vary by property, usage, solar generation, tariffs, equipment, installation and other factors. Program rules can change. Obtain a property-specific proposal, review its assumptions and confirm current eligibility before making a decision.